Part | Contents | Current Condition | Development |
---|---|---|---|
Part 1 |
General Principles |
Download | |
Part 2 |
Loads and Impacts
|
Download | |
Part 3 |
Materials
|
Download | |
Part 4-1 |
Foundations
|
Download | |
Part 4-2 |
Soil Improvement
|
Download | |
Part 5 |
Wharves
|
Download | |
Part 6 |
Breakwaters
|
Download | |
Part 7 |
Channels and Basins |
||
Part 8 |
Docks, Locks, Slipway and Shipyard |
||
Part 9 |
Dredging and Reclamation |
Download | |
Part 10 |
Other Port Facilities |
||
Part 11 |
Concrete and Reinforced Concrete Structures |
Part | Contents | Current Condition | Development |
---|---|---|---|
- |
Construction and Acceptance |
Download |
Part | Contents | Current Condition | Development |
---|---|---|---|
- |
Maintenance Requirement |
Download |
Part | Contents | Current Condition | Development |
---|---|---|---|
- |
Design Casebook |
||
- |
Maintenance Manual |
Phone : +84-(0)24-37683191
+84-(0)912439787
Fax : +84-(0)24-37683058
Email : cuchhvn@vinamarine.gov.vn