Design Requirements

Design Requirements
Part Contents Current Condition Development
Part 1

General Principles

Download
Part 2

Loads and Impacts

 

Download
Part 3

Materials

 

Download
Part 4-1

Foundations

 

Download
Part 4-2

Soil Improvement

 

Download
Part 5

Wharves

 

Download
Part 6

Breakwaters

 

Download
Part 7

Channels and Basins

Part 8

Docks, Locks, Slipway and Shipyard

Part 9

Dredging and Reclamation

Download
Part 10

Other Port Facilities

Part 11

Concrete and Reinforced Concrete Structures

Construction Requirements

Construction Requirements
Part Contents Current Condition Development
-

Construction and Acceptance

Download

Maintenance Requirements

Maintenance Requirements
Part Contents Current Condition Development
-

Maintenance Requirement

Download

Others

Others
Part Contents Current Condition Development
-

Design Casebook

-

Maintenance Manual

HOTLINES

Phone : +84-(0)24-37683191
                     +84-(0)912439787

Fax : +84-(0)24-37683058
Email : cuchhvn@vinamarine.gov.vn

LINKS

ACCESS ANALYTICS

    • Total visits: 25047376
    • Online: 28